Bukhtarma GEC LLP "Kazzinc"

prof_view

Bukhtarminskaya HPP is a hydroelectric dam with a hydroelectric dam building. The installed capacity of the power plant is 675 MW, the design average annual power generation is 2344 million kWh. The composition of the waterworks facilities

All professions

Regeneration and disposal engineer

Modernization Engineer for Traditional Energy Equipment

Process Engineer for High Temperature Materials Science

Economics Specialist on Demand

Energy manager

Engineer for the development of CAD based on multiphysics modeling of energy objects

Industrial psychologist