JSC "Station Ekibastuzskaya GRES-2"

prof_view

JSC "Station Ekibastuzskaya GRES-2" is a Kazakhstani energy company with an installed capacity of 1000 MW. The Joint Stock Company represents the interests of the two largest Kazakhstan energy holdings: Samruk-Kazyna JSC and Samruk-Energo JSC, which each own 50% of the shares. Ekibastuz GRES-2 is a thermal power plant in the city of Ekibastuz. Construction work at the site of the Ekibastuz GRES-2 began in 1979. The first power unit was commissioned in 1990, the second - in 1993 with a capacity of 500 MW each. Each one. In 2010, the labor collective celebrated the 20th anniversary of the plant, in December 2013 it will be 20 years since the launch of the 2nd power unit, which was included in the network by the Head of State Nursultan Nazarbayev.

All professions

Regeneration and disposal engineer

Modernization Engineer for Traditional Energy Equipment

Process Engineer for High Temperature Materials Science

Economics Specialist on Demand

Energy manager

Engineer for the development of CAD based on multiphysics modeling of energy objects

Industrial psychologist